The replacement windows/doors must be of similar appearance to the original when viewed from the exterior.
You should establish with Brighton & Hove City Council that it has no objection to the proposed installation and should obtain any necessary planning consent. In addition to this you must ensure that your window installer is FENSA registered. If not you will be required to obtain the necessary permissions from the Building Control Department at Brighton & Hove City Council.
A permit to work must be obtained from the Managing Agents and the management of Hilton Metropole Hotel before work commences.
All work must be confined to the hours of 8.00am to 5.00pm Monday to Friday. No work is to be carried out during weekends or public holidays.
Any original drip trims above, and cills below the original windows must be removed as part of your window replacement. Your contractor will need to carefully cut through the sealant above the drip trim and below the cill prior to removal, to avoid damage to the protective coating on the external walls.
Materials or waste are not to be stored in such a manner as to cause obstruction of the paths, landings or stairs. Waste and redundant materials to be removed from the site by your contractor at the end of each working day.
You would be responsible for ensuring any damage that may be caused to the external fabric of the building by your contractor during the course if the installation works is rectified to the satisfaction of Sussex Heights (Brighton) Ltd and the Managing Agents.
The installation of UPVC units will not affect your liability to contribute to the cost of future external redecoration programmes, except in as much as it may reduce the overall cost of such works and hence your contribution thereto.
Should you have any queries please feel free to contact the Managing Agents.